Panavia Tornado

Two of the main features of the new aircraft were the wing, and the engine air intakes. The first was, as we have seen, of variable geometry wing, featured by flap and slat lifting system, and by four underwing pylons, destined to carry fuel tanks and other stores, which were able to pivot in order to maintain the correct position during the flight. The intakes were also with a variable geometry of the ramps, able to adapt to low and high speeds, and of horizontal wedge design. That solution was able to grant good performances at high incidence too. The intakes were in high position well ahead of the wing, in order to provide a good airflow to the engines, and good pressure distribution at the engines compressor faces.
About the engines, it was finally decided that they had to be two turbofans developed by the British industry, thanks to the experiences gained by Rolls-Royce and Bristol Siddeley in the previous programmes. The selected project, the RB.199, was – like the aircraft – completely new, but proved to be an excellent choice. However, the selection of another engine, like an American one, probably could have led to the retirement of the UK from the program. Also for the engine a new consortium was created, the Turbo Union, featured by approximately the same workshare as for the airframe: 40% each for Rolls-Royce and MTU, and 20% for FIAT Aviazione. To be noted that works on the engine proceeded at good pace, as the first ground run of the RB.199 took place on 27 September 1971, while the first flight test was conducted on 20 April 1973, using an Avro Vulcan bomber, specifically modified to accommodate an extra engine to the underside. Also in the avionics sector, the UK was in the lead: most of the avionics suite of the MRCA was an evolution of that developed for the TRS.2 project, and was featured by a Terrain Following/Terrain Avoidance (TF/TA) radar, and a robust Electronic Warfare system.

 tornado   zd3

The project was frozen on 26 April 1970, and the full scale development phase started on July 20. The MRCA was really complex, and it was decided to adopt a large series of prototypes and pre-series aircraft, in order to accelerate the test programme, and to spread the work over the three countries. However, other aircraft were involved in the development phase, in particular in the activity on the engine and on the radar. A Vulcan bomber was converted to act as test bed for the RB199 engine, thanks to the installation of a half fuselage under the Vulcan’s fuselage, complete with air intake, and afterburner. The half fuselage included also one Mauser 27mm gun and ammunition, in order to test also live fire action. From 1972 to 1979, this test bed logged some 126 flights, and 286 flying hours. A Mauser gun was also tested in-flight in 1972 using a Lightning F.2A. In the period 1972-1973 also the radar system was tested in-flight, using two Buccaneers transformed by the Marshall industry. Works included the installation of a radar, but also of an inertial navigation system, an autopilot, an Head-Up Display (HUD), and other minor systems and screens destined to the MRCA. The two aircraft worked in this role until 1978-1980.
It was decided that Panavia had to manage the flight test and development phase using 15 aircraft, nine flying prototypes, one for static tests, plus six pre-series aircraft. The flying activity was divided between the industry and military test organizations of the three countries, trying to avoid duplications, and so waste of time and money. The workshare was related to the participation of each country in the programme. Great Britain was to fly four prototypes (P.02, 03, 06 and 08), while West Germany had three (P.01, 04 and 07), and Italy two (P.05 and 09). About the pre-series aircraft, the UK had two (P.12 and 15), Germany three (P.11, 13 and 16), and Italy one (P.14). To this list must be added one static test aircraft, which was designated P.10.
The first prototype to fly was the German P.01 (registered D-9591, military serial 98+04), whose assembly works started at the plant at Ottobrunn in November 1972. In February 1973 it was moved to the German test airbase at Manching, and at that time, the first flight was scheduled for December 1973. However, due to engine problems appeared on the Vulcan test bed, the first flight was delayed for about eight months. At the end, P.01 took-off for the first time on 14 August 1974. In order to balance the fact that the first flight had been given to Germany, pilot of the maiden flight was BAC test pilot Paul Millett. Only one month later, the aircraft received a new name, being officially designated Tornado, a name that spell in the same way (and has the same meaning) in German, British and Italian language.
On 30 October 1974 it was the turn of P.02 (XX946), the first British prototype, to take the air. Each of the test aircraft was scheduled to undergo a specific series of trials. P.02 was tasked to explore and expand the flight envelope in clean configuration. It was found that this aircraft, which was equipped with the very first model of engine, had high consumption rates, and to solve the problem of short endurance, it was decided to introduce the in-flight refuelling probe, and to carry out the in-flight refuelling test, at this early stage, well in advance of what was scheduled at the beginning.
 tornado   zd4

Then, on 5 August 1975, P.03 (XX947) recorded its maiden flight from Warton. It was the first equipped with dual controls, and with a real radome for the radar. It was destined to stall and spin test, and for this it was equipped with a spin recovery parachute, and with an emergency power unit. It was also used for trials with heavy external loads. On 2 September was then the turn of P.04 (98+05), from Manching; this prototype was equipped with the full avionics suite, and was tasked to test the navigation, autopilot and ground mapping capabilities. P.05 (X-586) was the first Italian prototype, and took the air on 5 December 1975, from Turin Caselle. This aircraft was unlucky, as at the end of its sixth flight was damaged at landing, and had to be stopped for about two years. It was tasked to carry out tests on external stores and the integrated weapon systems, and due to the stop, part of these test were re-assigned to P.02. Next came P.06 (XX948), the third British, which had its maiden flight on 19 December 1975. This too was used for tests on armament, stores release, and Mauser gun live fire. Since it received both the 27mm guns, the test equipment (usually fitted in the gun bays) was moved to the rear cockpit, making this aircraft a single seater. This was also the first to incorporate some aerodynamic modifications to the rear fuselage, destined to reduce drag and improve handling. On 30 March 1976 it was the turn of P.07 (98+06), the last German, while on 15 July 1976 took-off P.08 (XX950). These two were completed in about the same configuration, which included the complete weapon system, including the full capability of the TF/TA radar, and were used to trial the effectiveness of the weapon system. The last prototype, the Italian P.09 (X-587) flew on 5 February 1977, and underwent a test programme focussed on the various weapons and external loads. The nine prototypes carried on their test for all the 1970s, and suffered for two fatal crashes: the first (P.08) occurred in June 1979, during a low-level mission over the Irish Sea; the second in May 1980, when P.04 crashed in West Germany during the practise for an air display, and the two on board were killed. The test programme recorded some delays, and the workshare was re-distributed between the remaining seven aircraft.
The prototypes were followed by the six pre-series aircraft. The first flew on 5 February 1977, as P.09, as was P.11 (98+01) a German aircraft, followed by P.12 (XZ630), P.13 (98+02), P.14 (X-588, later MM.7001), P.15 (XZ631), and P.16 (98+03), which was the last, and flew for the first time on 26 March 1979. The pre-series units were used to complete the test programme, and for operational test and evaluation of the various military test units in the three air forces.
In the meantime, production of the first series aircraft had already started, and the first two were rolled out in June 1979, on 5 June the first British (BT.001, serial ZA319), and on 6 June the first German (GT.001, serial 43+01). They were both trainers, with dual controls in the cockpit. The first to fly was the British, on 10 July, followed by the German on 27 July. Italy followed with some delay, and the first Italian series production Tornado (IT.001, serial MM.55000) was rolled out on 1 July 1981.
tornado   zd5

 

 

[…]

Read more…

tornado   okl

  • Recommended - Armour

History of the 40/43M Zrínyi Assault Howitzer
History of the 40/43M Zrínyi Assault Howitzer The lessons learned from the ongoing war already proved the combat...
History of the  Turán Medium and Heavy Tanks  in World War II
History of the Turán Medium and Heavy Tanks in World War II The Hungarian Army made serious efforts to build up an independent,...
German Medium Tank  Panzerkampfwagen III  from Ausf. H to Ausf. N
German Medium Tank Panzerkampfwagen III from Ausf. H to Ausf. N In the mid-1930s German authorities intensified their efforts...
Renault FT & M1917 Light Tanks
Renault FT & M1917 Light Tanks During its 25-year service, the Renault FT tank was used in many...
Operational History of the Hungarian Armoured Troops in World War II
Operational History of the Hungarian Armoured Troops in World War II In 1938, concurrently with German territorial demands, Hungary...

Versions armed with a 37 mm gun