Challenger 2

In late 1986, the senior army officer responsible for equipment procurement, the Master General of the Ordnance, asked the sole British tank design and production company Vickers PLC, to suggest their options for a new MBT. This was done in spring of the following year, Vickers basing their proposal on an updated version of the Challenger hull, coupled to a new turret and gun, based upon their private venture Vickers Mk 7/2 design. Not all elements of the Vickers proposal found favour, and a period of negotiation followed in which the design was developed into an acceptable form. Although around 800 were originally called for, the so-called "peace dividend" following the fall of the Berlin Wall led to a much smaller requirement, and eventually a total of 386 Challenger 2, as the new tank was called, were built. The sheer – and ever increasing – cost of the new tank frightened the Treasury, who tried their best to reduce the numbers down, and which led them to getting involved in the other possibilities of fielding a Chieftain/Challenger replacement, which involved everything from a modified Chieftain, through to various combinations of Challenger 1 modifications, to the possibility of buying a foreign tank off the shelf. (At one point in the programme the estimated cost of the new tank rose from £1.2Bn to £1.7Bn in just over a year!)

 

ps30 challenger2 3


This latter proposal found a great deal of support from many senior RAC officers who had been angered by the decades of problems caused by Chieftain and Challenger, and who were not well-disposed towards anything that came from the Vickers team. They were fully aware of the two main competitors, the extremely mobile and reliable German Leopard 2, and the more heavily armoured but still impressive US M1A", both of which used a 120mm smoothbore gun. Although a series of competitive and comparative trials were conducted (and which included the French Leclerc which, whilst innovative, found few supports in Britain), at the end of the day the decision was as much political as military and the Prime Minister was only interested in the "Buy British" option.
Nine Prototypes were built to develop the tank, and were extensively tested from 1990 on. These tanks bore the British vehicle registrations of 06SP87 to 06SP95; for simplicity they were generally referred to as tanks V1 to V9 respectively. They were used for an extensive range of trials, both to improve the design and to increase the reliability. Early versions of the prototype hulls were very similar to the CR1 from which they were derived, although a number of external changes made them noticeably different as the design was fine-tuned.

 

ps30 challenger2 4


Delays to the development of the new tank came from a variety of sources, the first of which was the Gulf War on 1991 in which all of Vickers efforts were refocussed on supporting the CR1 tanks deployed to Saudi Arabia. The biggest delay however came about when the first production tanks delivered in 1994 were found to have a huge list of faults, a few were major and the majority were minor… but cumulatively the overall result was a tank which failed to meet the requirement – and poor reliability and availability were not acceptable to a generation of Generals brought up on Chieftain. Therefore the entry into service of the tank, originally thought to be possible in the early 1990s, was delayed until the production tanks were made reliable before they were placed into the hands of the crews. Well over 100 tanks had already been delivered and therefore the problem involved sorting out these tanks as well as changing production standards and procedures for those yet to be built. Thus the official date of entry into service only took place on 30th June 1998 when the first regiment to receive them, Scots DG, received the last of their 38 tanks. At the time of writing the army is maintaining only three armoured regiments: the Queens Royal Hussars, the Kings Royal Hussars, and the Royal Tank Regiment. In the near future this may reduce again to only two.
In total the army bought 386 service tanks, in addition to the nine prototypes. These were in the army Vehicle Registration Mark or VRM system as follows: 61KK68 to 62KK99 (132 tanks), and DP70AA to DT23AA (254).2 One tank has been lost on operations, in an unfortunate operational accident – the infamous Blue on Blue – in Iraq in 2003, but many other tanks deemed to be surplus have been destroyed by stripping and then melting down. Twenty two Driver Training Tanks or DTT were also procured. These have special observation cabins fitted to allow the most efficient driving instruction, and are only used by the training organisation, and not in the operational regiments; they are unarmoured. Two main variants of the CR2 have also been developed for use by armoured engineers, the Titan bridgelayer and the Trojan engineer tank, more of which later.
Both the government and Vickers were extremely keen to sell the tank overseas; enormous sums had gone into its development and it would be advantageous if at least some come be recouped with export sales.
CR2E – the E standing for export – was developed using Prototype V1 to make the tank more attractive to potential export markets; only one was built. The turret electronics architecture was revised, with a new fire control and battlefield management system installed, as well as new sights, most importantly the French-made SAGEM 580 gyro-stabilised day/night sight for the commander, giving the tank a genuine 24 hour hunter-killer capability. The gunner's sight was also made by the same company. The CV12 powerpack was replaced with a more powerful and compact 1500 bhp diesel unit made by the German MTU company, coupled to a Renk automatic transmission. The smaller pack allowed the spaced freed up to be used for the installation of other systems, including more ammunition stowage or fuel.
The CR2E was vigorously promoted to a number of nations until 2005, when it was decided to halt the project; the attempts to sell CR2E to Greece were tainted by accusations of double-dealing, rigged trials by competitors and outright bribery, but the Leopard 2 was selected instead. It is probably fair comment to say that this failure put off a number of other nations who watched the contest with interest. Oman is the only country other than Britain to purchase Challenger 2, despite vigorous sales and marketing attempts to many states, including Greece, UAE, Saudi Arabia, Sweden and Qatar. A total of 38 have been purchased, along with two DTT, and which can be expected to remain in service for many years, supported by British officers and SNCOs who provide invaluable expertise – and in the process learn much about operating tanks in desert conditions.

ps30 challenger2 5

 

[…]

Read more…

PS30 challenger2 www

  • Recommended - Armour

Challenger 2
Challenger 2 The introduction into British army service of the Challenger...
Renault FT & M1917 Light Tanks
Renault FT & M1917 Light Tanks During its 25-year service, the Renault FT tank was used in many...
Operational History of the Hungarian Armoured Troops in World War II
Operational History of the Hungarian Armoured Troops in World War II In 1938, concurrently with German territorial demands, Hungary...